Jump to content

Website update 2011: Difference between revisions

From CC Public Wiki
Jon Phillips (talk | contribs)
Jon Phillips (talk | contribs)
No edit summary
 
(14 intermediate revisions by 2 users not shown)
Line 6: Line 6:
* All work will be done on branch of CC code repository, against existing theme to minimize integration time and regressions
* All work will be done on branch of CC code repository, against existing theme to minimize integration time and regressions


== Roadmap ==
=== Helping ===


* note: each deadline below assumes CC approval on same date, given constant communication during development; Check-in on progress each day via skype/IRC
* [http://code.creativecommons.org/issues Features and Issues]
* [[Website_update_2011/HOWTO_Update_Website_Front_Page]]
* [[Website update 2011 Past Notes]]


=== Implement "phase 1" redesign for main CC website ===
[[Category:Development]] [[Category:Website]] [[Category:2011]]
* 8/22 CONCRETE PLAN: identify concrete elements of "phase 1" mockup design to be implemented, any elements not feasible that will not be implemented
* 8/26 HOMENAV IMPLEMENTED: home page and navigation elements implemented; check-in with CC web redesign committee
* 9/2 INTERIOR PAGES: changes to interior landing and about themes/pages implemented
* 9/9 LICENSE CHOOSER: overall look/navigation changes also implemented for license chooser; check-in with CC web redesign committee
* 9/16 REVIEW BUGFIX LAUNCH: bug fixing/testing  completed, launch at CC global summit
 
=== Post-summit redesign of CC net/donor site ===
* 10/7 integration of design elements from main website redesign completed for pre-testing of campaign soft launch
 
=== Post-campaign launch redesign of other sites ===
* goal for each is to incorporate key elements from redesign, but start from and stay very close to native theme of relevant software
* 10/14 wiki
* 10/21 labs/other CC sites using wordpress multiuser
* 10/28 search
* cc.net?

Latest revision as of 07:06, 11 October 2011

Overview

  • CC is working on a website redesign; primary visual redesign to be completed by CC Global Summit (16 September 2011)
  • initial mockups provided by Lybba Dec 2010
  • design work will be continued by Fabricatorz Aug 2011; primary contacts Jon Phillips, Christoper Adams
  • CC manager Mike Linksvayer; help from CC Tech (Nathan Kinkade, Christopher Webber), Jane Park, Timothy Vollmer
  • All work will be done on branch of CC code repository, against existing theme to minimize integration time and regressions

Helping